MNR Power C&S Improvement Project
About This Project:
End User: Metro North
Contractor: Judlau Contracting
Description: The project involves the complete design, construction and testing of replacement infrastructure for various MNR Power, Communications and Signaling equipment and cabling that was damaged as a result of Hurricane Sandy.
Twinco Scope of Work:
Over 5500’ of Stainless Steel Cable Tray
17 – 48” x 96” x 18” SS NEMA 4x Pull Boxes
17 – 48” x 96” x 18” SS NEMA 4x Pull Boxes