Modernize Signal System: Dyre Avenue Line

About This Project:

End User: NYCT

Contractor: TC Electric

Description: This project will provide for the replacement of all automatic signals at two existing Interlockings (Dyre and Morris Park) with two different Solid State Interlockings (SSI) along the #5 “Dyre” Line.

Twinco Scope of Work:

  • Train Stops and Layouts

  • SS and Aluminum Cable Tray

  • Vibration Isolated Switch Heater Cases

  • Holophane Switch Point Lights

  • BH110 Rectifiers

  • Various Wayside Equipment

Previous
Previous

MTA-NYCT Rehabilitation Of The Culver Line Viaduct

Next
Next

MNR Power C&S Improvement Project