South Ferry Terminal Complex Rehabilitation Contract
About This Project:
End User: NYCT
Contractor: Five Star Electric
Description: The work includes removal and installation of new electrical equipment, communication, fiber optic equipment, HVAC system, ventilation system, pumping equipment, traction power system, signal work, track work, installation of seven elevators, and two escalators, cleaning/replacement of architectural finished of the station, chemical grouting, and painting.
Twinco Scope of Work:
Train Stops and Layouts
Stainless Steel and Aluminum Cable Tray
LED Holding/Starting Lights
BH110 Rectifiers
Various Wayside Equipment (Column Clamps, Riser Boxes, Fuse Boxes, etc)